Documentary following the work of Allelys, one of the leading multimodal logistics and specialist projects providers in the country.
Advertisement space available
Reach thousands of daily viewers · size 1200 x 200
Episode 1
On the south coast, in Shoreham-by-Sea, a team of heavy hauliers are gearing up to shift a 150-tonne reactor and a 195-tonne transformer to an electrical substation 40 miles away in Ninfield.
Episode 2
On the south coast, a crack team of heavy hauliers are continuing their record-breaking challenge, as they shift a 150-tonne reactor and a 195-tonne transformer across Sussex to an electrical substation in Ninfield.
Episode 3
In Lincolnshire, 36-year heavy haulage veteran Steve Moss's two-day mission is to deliver a 60-tonne reel of electrical cable for an ambitious green energy scheme. Meanwhile in Warwickshire, a three-tonne statue needs taking to its new home.
Episode 4
Driver Zack steers his 144-wheeled, 60-ton trailer from Warwickshire to Worksop to first load and then take a 190-ton reel of steel crane cable to Immingham docks, being careful of risk-taking car drivers along the way.
Episode 5
The crew in the northeast collects a whopping 255-tonne transformer bound for a substation in Woodmansey, while back at HQ it's all hands to the pumps when the team needs to prepare a giant girder frame.
Episode 6
Veteran driver Col is in for a demanding week when he takes on the challenge of two mammoth moves. First he has to tackle a 63-tonne cable reel, hopefully leaving enough time for his second cargo.
Episode 7
Two 94-tonne electrical transformers bound for a green energy project arrive by ferry from Rotterdam. Veteran heavy haulier Gavin and his protégé Rob must transport them from Immingham Dock in Lincolnshire to Aberdeen.
Episode 8
The second day of the haul of two 94-tonne transformers destined for a green energy project will be even more challenging. Just 16 miles in, another tyre burst forces a layby pitstop, and there's a bigger problem yet to come.
Episode 9
At Avonmouth Dock in Bristol, project manager Simon and the team face a huge day of moving some massive industrial units that have arrived on a vessel from India. The units need to be moved from the quayside into the storage area.
Episode 10
In the Midlands heavy Haulier Colin Chisnall has a heavyweight problem. A 107 tonne transformer needs shifting from the outskirts of Walsall to the yard in Studley.
Reach thousands of daily viewers · size 970 x 90
2013 · ★ 5.8
2006 · ★ 6.1
1989 · ★ 6.6
2019 · ★ 7.8
2013 · ★ 6.5
2015 · ★ 7.5
1964 · ★ 6.6
1983 · ★ 6.9
2009 · ★ 7.8
2021 · ★ 6.9
2011 · ★ 7.1
2018 · ★ 7.0
2014 · ★ 7.1
2008 · ★ 6.2
2005 · ★ 6.6
2003 · ★ 6.4
2017 · ★ 6.9
2011 · ★ 7.9
2019 · ★ 6.9
2013 · ★ 6.0